Spring Valley Caverns


SVC1 Building Entrance

Quonset bldg. covering sink
Click for larger view

Original WWII Quonset building before demolition



Excavation and preparation for building foundation showing two separate cave entrances into Spring Valley Caverns

Notice John  standing on upper right shelf
Click for larger view


Starting on foundation
Click for larger view

Slab is poured     



A look from the other side

Rebar reinforced
Click for larger view


Foundation complete
Click for larger view

With the foundation and slab complete, work begins on the walls



Work begins on the second story of this 38 foot high building

Next level of construction
Click for larger view


A look inside
Click for larger view

Forming begins on the main floor



Now the 18" thick walls leading up from the second story can be constructed

Installing form liners
Click for larger view


Roof construction begins
Click for larger view

All four walls are up, and roof construction is under way



Roof installed, windows and doorway being set in, and the arch pad is poured


Click for larger view


Windows and walls
Click for larger view

Visible in this photo is the simulated limestone wall treatment.  This natural looking surface treatment was applied throughout the building interior



A view of the building from inside the cave.  Directly to John's left is a culvert pipe installed to gain access to a third cave entrance discovered during the construction of the building

John inside basement level
Click for larger view


Masons constructing the limestone arch
Click for larger view

Masons constructing the archway building exterior in limestone



Formation of the front archway

Forming the limestone arch
Click for larger view


Stays 48 degrees all year
Click for larger view
The completed entrance to SVC1