SVC1 Building Entrance
|
Original WWII Quonset building before demolition |
|
Excavation and preparation for building foundation showing two separate cave entrances into Spring Valley Caverns |
|
Slab is poured |
|
A look from the other side |
|
With the foundation and slab complete, work begins on the walls |
|
Work begins on the second story of this 38 foot high building |
|
Forming begins on the main floor |
|
Now the 18" thick walls leading up from the second story can be constructed |
|
All four walls are up, and roof construction is under way |
|
Roof installed, windows and doorway being set in, and the arch pad is poured |
|
Visible in this photo is the simulated limestone wall treatment. This natural looking surface treatment was applied throughout the building interior |
|
A view of the building from inside the cave. Directly to John's left is a culvert pipe installed to gain access to a third cave entrance discovered during the construction of the building |
|
Masons constructing the archway building exterior in limestone |
|
Formation of the front archway |
| The
completed entrance to SVC1 |
|